top of page
shutterstock_2381165457.jpg

CASE STUDY:

Wastewater to Green Hydrogen

7.png

First industrial BOSCH Hydrogen Boiler

8.png

Operational Wastewater Feedstock

9.png

Two on-site 250 kW demonstration systems

shutterstock_2580079491.jpg
Welsh Water.png
WWU.png
YV.png
multi d (1)_edited.png
NGED logo.png
multi d (26).png
shutterstock_2580079491.jpg
yv map.png

Yeo Valley Site

  • 20% hydrogen blend supplied to onsite natural gas boiler

 

  • Onsite utilisation of by-product oxygen within the wastewater treatment process

  • Flexible water feedstocks, including process effluent, rainwater and borehole supply

dcww map.jpg

Welsh Water, Cardiff Site

  • 100% hydrogen boiler installation

  • Low-carbon heat supply for Dŵr Cymru Welsh Water offices

  • Multiple water feedstocks, including final effluent, rainwater and estuarine sources

bottom of page